Waterflood Progam

Coleville/Kerrobert – Waterflood Injection Program

Numerous projects from 2013 to 2015

  • Directional boring daisy-chained well sites
  • Tie-ins from well-head to header systems
  • Fabrication/installation of modular piping skids

Emulsion collection systems

  • Multi well-pad set-ups
  • Directional boring daisy-chained well sites
  • tie-ins from pipelines to facilities

Facility upgrades/Refurbishing

  • Integrity based piping replacement
  • satellite facility construction
  • cutting/capping piles
  • setting building modules
  • heat exchanger installs
  • compressor install
  • flare stack install
  • custom pipefitting

Beaumont – Waterflood Program

2013 Water Flood

  • Phase 1 (May 2013): 11.5km of 3″ FP
  • Phase 2 (July 2013): 12.1km of 3″ FP

2014 Water Flood

  • Phase 1 (May 2014): 11.2km of 3″ FP
  • Phase 2 (July 2014): 10.4km of 3″ FP
  • Phase 3 (August 2014): 17.9km of 3″ and 4″ FP

2015 Water Flood

  • Phase 3A (January to March 2015): 27.6km of 3″ and 4″ FP

Module skid #1     size 40 x 40

Module skid #2     size 54 x 20

Module skid #3     size 54 x 20