Plover/Cactus Lake

Numerous projects from 2012 to Present:

  • Tank Farm Expansion
  • Civil work for containment expansion (including building tank pads)
  • Tank modifications/upgrades
  • Fabricate/install new nozzles and re-pads
  • Cut and Cap Piles
  • Extend existing pipe rack
  • Coordination with operations for shut downs, tie-ins and commissioning
  • Piping Systems included: internally coated (with Scotchkote 134), fibreglass and stainless
  • Multi-well set-ups
  • Layout and drive piles
  • Install pipe racks
  • Tie-in wells with internally coated piping
  • Facility upgrades
  • Closely worked with engineering for design and problem solving
  • Shut-downs, tie-ins and commissioning
  • Setting equipment
  • Water Injection Program
  • Converting pipelines from Emulsion to Injection
  • Custom pipefitting for tie-ins to exiting and new disposal wells
  • Conversions and upgrades at satellites to allow for field expansions
  • All piping internally coated
  • Pre-fabricating well set-up packages
  • Coordinate riser locations for pipelines
  • SAGD Facility Expansion
  • Overhaul to existing facility (upgrades and expansion)
  • Demolition and reclamation
  • Upgrade treater internals
  • Shut-downs, tie-ins and commissioning for abandoned and new systems