Latest Projects

Lindbergh Facility

Tying-in new disposal cavern, installing booster pump to brine disposal pumps and installing brine return line to brine tank.

Read More...

Silver Lake Waste Facility

The Silver Lake Facility was built by BPC Services.  It started with the shop fabrication of all of the piping requirement for site. This included welding, NDE, hydro testing and painting of all components.  There was over 6000 weld inches of pipe fab. The field installation of this piping was executed over several months.  All of the major process components were placed and the prefabbed piping was installed to tie them together along with the construction and installation of the structural for pipe racks and walkways. Total man hours on this project were over 10,000 with no safety incidents. Shop Construction: Pre-fabricate piping packages Pipe rack Structural Site Work: Cut & cap piles Set and install Tanks Heat exchanger Boiler skid MCC skid Polymer injection skid Pipe

Read More...

Anzac Waste Facility

Shop Construction: Fabricate 3 complete process modules. All skid construction, piping , painting and building constructed in our yard ready to ship. Fabricate 8 pipe modules with all pipe, primed, heat traced and insulated. Construct vac off-load skid. Complete with pipe, painted, equipment installed and building. All site pipe racks. Site Work: The mechanical installation of all the components that make up the facility. Cut and capping all piles Set and install Tank farm modules 1, 2, 3 and tanks H2O skid Heat exchanger Flare stack Boiler skid Cooler skid MCC skid Polymer Injection skid Tricanters 8 pipe modules Pipe racks Catwalks and stairs All equipment setting included setting-up and rigging for the cranes (80-350 tonne)

Read More...

Waterflood Progam

Coleville/Kerrobert – Waterflood Injection Program Numerous projects from 2013 to 2015 Directional boring daisy-chained well sites Tie-ins from well-head to header systems Fabrication/installation of modular piping skids Emulsion collection systems Multi well-pad set-ups Directional boring daisy-chained well sites tie-ins from pipelines to facilities Facility upgrades/Refurbishing Integrity based piping replacement satellite facility construction cutting/capping piles setting building modules heat exchanger installs compressor install flare stack install custom pipefitting Beaumont – Waterflood Program 2013 Water Flood Phase 1 (May 2013): 11.5km of 3″ FP Phase 2 (July 2013): 12.1km of 3″ FP 2014 Water Flood Phase 1 (May 2014): 11.2km of 3″ FP Phase 2

Read More...

Plover/Cactus Lake

Numerous projects from 2012 to Present: Tank Farm Expansion Civil work for containment expansion (including building tank pads) Tank modifications/upgrades Fabricate/install new nozzles and re-pads Cut and Cap Piles Extend existing pipe rack Coordination with operations for shut downs, tie-ins and commissioning Piping Systems included: internally coated (with Scotchkote 134), fibreglass and stainless Multi-well set-ups Layout and drive piles Install pipe racks Tie-in wells with internally coated piping Facility upgrades Closely worked with engineering for design and problem solving Shut-downs, tie-ins and commissioning Setting equipment Water Injection Program Converting pipelines from Emulsion to Injection Custom pipefitting for tie-ins to exiting and new disposal wells Conversions

Read More...

External Pipeline Inspections

With our state of the art equipment and quality trained staff – BPC Services Group has conducted hundreds of kilometers of external pipeline inspections to date. We provide our clients with accurate data and reports to help them maintain their systems by providing early detection on problems that could quickly lead to larger issues down the road. Our quick turnaround also allows our clients to assess the issues as we find them, ensuring that the most important problems get dealt with as soon as possible. As environmental awareness and controls increase, so has our client base. Our clients have continued to use our services to evaluate their systems and aid them in making decisions as to what the next move should be. For more information on our external pipeline inspections please

Read More...

Trenchless Pilot

BPC Services Group partnered up for our first and very successful trenchless pipeline installation. The line that was to be installed initially was a 3 inch steel line intended to capture annulus gas from a production pad which was at the time being vented to the atmosphere. The initial plans involved a 950 meter line which was to cross a secondary highway and involved 300 meters of brushing which would have been at our client’s expense. During discussions the possibility of utilizing the BPC Trenchless System was discussed at length. The issues discussed were right of way access, control of burial depth, mud to surface contingency planning and cost controls. After several meetings, it was decided to use this method as a pilot project to determine the viability of this method

Read More...

Trenchless Pipeline Install

An existing oilfield located adjacent to the west boundary of the city of Lloydminster, and over the years some of the production lines had deteriorated due to the properties of the product being produced. The lines were taken out of service and a completely new line was required to replace the existing lines. There were two lines of concern; a distance of 600 meters and the second line was a distance was 300 meters. The area the lines traversed were farmland currently under crop production and small seasonal sloughs common to the area. Some of the existing right of way was overgrown by small poplar and willow regrowth. The owner company entered into a contract with us to utilize the BPC Trenchless Pipeline System for this work. The trenchless system would minimize surface disruption

Read More...