Fabrication Project completed in 2020 BPC Services LTD team fabricated the skid and piping as well as completed the installation of piping and equipment for this 2020 project.
Water Depressurization Transfer Skid
Lindbergh, AB Facility
Tying-in new disposal cavern, installing booster pump to brine disposal pumps, and installing brine return line to brine tank in Lindbergh, Alberta.
The Waste Facility in Silver Lake, BC
The Silver Lake (British Columbia) Waste Facility was built by BPC Services. It started with the shop fabrication of all of the piping requirements for the site. This included welding, NDE, hydro testing, and painting […]
The Waste Facility Fabrication in Anzac, AB
The Waste Facility Fabrication Shop Construction: Fabricate 3 complete process modules. All skid construction, piping, painting, and building constructed in our yard ready to ship. Fabricate 8 pipe modules with all pipe, primed, heat traced, […]