Lindbergh Facility

Tying-in new disposal cavern, installing booster pump to brine disposal pumps and installing brine return line to brine tank.  

Read More

Silver Lake Waste Facility

The Silver Lake Facility was built by BPC Services.  It started with the shop fabrication of all of the piping requirement for site. This included welding, NDE, hydro testing and painting of all components.  There […]

Read More

Anzac Waste Facility

Shop Construction: Fabricate 3 complete process modules. All skid construction, piping , painting and building constructed in our yard ready to ship. Fabricate 8 pipe modules with all pipe, primed, heat traced and insulated. Construct […]

Read More

Waterflood Program

Coleville/Kerrobert – Waterflood Injection Program Numerous projects from 2013 to 2015 Directional boring daisy-chained well sites Tie-ins from well-head to header systems Fabrication/installation of modular piping skids Emulsion collection systems Multi well-pad set-ups Directional boring […]

Read More

Got Questions?
We Got Answers.