The Silver Lake (British Columbia) Waste Facility was built by BPC Services.  It started with the shop fabrication of all of the piping requirements for the site. This included welding, NDE, hydro testing, and painting of all components.  There were over 6000 weld inches of pipe fab.

The field installation of this piping was executed over several months.  All of the major process components were placed and the prefabbed piping was installed to tie them together along with the construction and installation of the structural for pipe racks and walkways.

Total man-hours on this Waste Facility project were over 10,000 with no safety incidents.

Shop Construction:

  • Pre-fabricate piping packages
  • Pipe rack Structural

Site Work:

  • Cut & cap piles
  • Set and install
    • Tanks
    • Heat exchanger
    • Boiler skid
    • MCC skid
    • Polymer injection skid
    • Pipe racks and piping

 

Directional Drilling

Horizontal Directionally Drilling (HDD) has proven itself over the last few years to be a very effective technique for the installation of pipelines and other utilities in sensitive or congested areas.

Directional Drilling

Pipeline Integrity

At BPC Services LTD we provide cost effective solutions for integrity management programs on regulated pipelines that will ensure regulatory compliance and public safety.

Pipeline Integrity

Fabrication

Our facilities division at BPC Services Ltd presently offer construction services that include both “Shop Fabrication” and “Field Facility Activities”.

Fabrication